{"id":696,"date":"2018-06-14T17:16:41","date_gmt":"2018-06-14T16:16:41","guid":{"rendered":"https:\/\/www.oakdeanconstruction.co.uk\/?p=696"},"modified":"2019-09-23T09:06:04","modified_gmt":"2019-09-23T08:06:04","slug":"wellington-street-se1-completes","status":"publish","type":"post","link":"https:\/\/www.oakdeanconstruction.co.uk\/wellington-street-se1-completes\/","title":{"rendered":"Wellington Street, SE1 – Completes"},"content":{"rendered":"

Oakdean has completed the construction of the challenging mixed-use development, located in the Bathway Quarter of Woolwich, a historically sensitive location next to the Grade II listed Woolwich Town Hall.<\/p>\n

The development comprises of the demolition of the former Grand Theatre and Regal Cinema at 38 Wellington Street and the design and construction of a concrete framed building, providing 34 private tenure apartments and 455sqm of community space.<\/p>\n

Designed in a contemporary style, the building takes architectural cues from the adjacent Town Hall and surrounding areas, contributing to the regeneration of the local area.<\/p>\n

Find out more ><\/a><\/p>\n

\"\"<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"

Oakdean has completed the construction of the challenging mixed-use development, located in the Bathway Quarter of Woolwich, a historically sensitive location next to the Grade II listed Woolwich Town Hall. The development comprises of the demolition of the former Grand Theatre and Regal Cinema at 38 Wellington Street and the design and construction of a […]<\/p>\n","protected":false},"author":3,"featured_media":699,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[8],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.oakdeanconstruction.co.uk\/wp-json\/wp\/v2\/posts\/696"}],"collection":[{"href":"https:\/\/www.oakdeanconstruction.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.oakdeanconstruction.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.oakdeanconstruction.co.uk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.oakdeanconstruction.co.uk\/wp-json\/wp\/v2\/comments?post=696"}],"version-history":[{"count":0,"href":"https:\/\/www.oakdeanconstruction.co.uk\/wp-json\/wp\/v2\/posts\/696\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.oakdeanconstruction.co.uk\/wp-json\/wp\/v2\/media\/699"}],"wp:attachment":[{"href":"https:\/\/www.oakdeanconstruction.co.uk\/wp-json\/wp\/v2\/media?parent=696"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.oakdeanconstruction.co.uk\/wp-json\/wp\/v2\/categories?post=696"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.oakdeanconstruction.co.uk\/wp-json\/wp\/v2\/tags?post=696"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}